§ 30-48. Sewer depth.  


Latest version.
  • The 2012 International Plumbing Code, Section , 305.4.1 "Sewer Depth" is hereby deleted and replaced by the following:

    Building sewers that connect to private sewage disposal systems shall be a minimum of six (6) inches below finished grade at the point of septic tank connection. Building sewers shall be a minimum of six (6) inches below grade.

(Ord. No. 04-113, § 2, 12-21-04; Ord. No. 07-068, § 6, 9-13-07; Ord. No. 15-045, § 2, 6-11-15 )